10 · Capstone — Blue-Green Deploy Pipeline

Blue-green deployment runs two complete, identical production environments ("blue" and "green"). At any time, one is live (serving all traffic) and the other is idle. You deploy the new version to the idle one, test it for real, then switch traffic over atomically. If anything's wrong, switching back is instant. This capstone wires together modules 1-9 into one end-to-end pipeline.

Topology

                    ┌─────────────┐
  clients ────────▶ │ nginx (LB)  │
                    └──────┬──────┘
                    active pool ──▶ blue  (v1, currently live)
                    idle pool   ──▶ green (v2, being deployed/tested)
# /etc/nginx/sites-available/app.conf
upstream blue {
    server 127.0.0.1:3001;
}
upstream green {
    server 127.0.0.1:3002;
}
upstream active {
    server 127.0.0.1:3001;   # this line is what we flip: points at blue OR green
}

server {
    listen 80;
    server_name app.example.com;
    location / {
        proxy_pass http://active;
        proxy_set_header Host $host;
        proxy_set_header X-Forwarded-For $proxy_add_x_forwarded_for;
    }
}

The deploy script

#!/usr/bin/env bash
# blue-green-deploy.sh — deploys $1 (a release tarball) to the currently-idle color
set -euo pipefail

ARTIFACT="$1"
ACTIVE_CONF="/etc/nginx/sites-available/app.conf"

# 1. figure out which color is currently live by reading the nginx config
if grep -q "server 127.0.0.1:3001;" <(sed -n '/upstream active/,/}/p' "$ACTIVE_CONF"); then
  LIVE_COLOR=blue; LIVE_PORT=3001
  IDLE_COLOR=green; IDLE_PORT=3002
else
  LIVE_COLOR=green; LIVE_PORT=3002
  IDLE_COLOR=blue; IDLE_PORT=3001
fi
echo "Live: $LIVE_COLOR (:$LIVE_PORT)  Idle target: $IDLE_COLOR (:$IDLE_PORT)"

# 2. deploy the new artifact to the idle color only — live traffic is untouched
sudo systemctl stop "myapp-${IDLE_COLOR}"
sudo rm -rf "/opt/myapp-${IDLE_COLOR}/current"
sudo mkdir -p "/opt/myapp-${IDLE_COLOR}/current"
sudo tar xzf "$ARTIFACT" -C "/opt/myapp-${IDLE_COLOR}/current"
sudo systemctl start "myapp-${IDLE_COLOR}"

# 3. health-check the idle color directly, BEFORE it gets any real traffic
echo "Health-checking $IDLE_COLOR..."
for i in $(seq 1 15); do
  if curl -sf "http://127.0.0.1:${IDLE_PORT}/health"; then
    echo "OK"
    break
  fi
  [ "$i" -eq 15 ] && { echo "FAILED: $IDLE_COLOR never became healthy, aborting"; exit 1; }
  sleep 2
done

# 4. run a real smoke test against it (not just /health — hit a couple of real endpoints)
curl -sf "http://127.0.0.1:${IDLE_PORT}/api/version" | grep -q "$(git rev-parse --short HEAD)" \
  || { echo "FAILED: version mismatch on $IDLE_COLOR, aborting"; exit 1; }

# 5. flip nginx's "active" upstream to the now-verified idle color
sudo sed -i "/upstream active/,/}/ s/server 127.0.0.1:${LIVE_PORT};/server 127.0.0.1:${IDLE_PORT};/" "$ACTIVE_CONF"
sudo nginx -t && sudo systemctl reload nginx
echo "Switched live traffic to $IDLE_COLOR."

# 6. give it a few seconds under real traffic, then confirm it's still healthy
sleep 10
curl -sf "http://127.0.0.1:${IDLE_PORT}/health" || { echo "UNHEALTHY under real traffic — rolling back"; \
  sudo sed -i "/upstream active/,/}/ s/server 127.0.0.1:${IDLE_PORT};/server 127.0.0.1:${LIVE_PORT};/" "$ACTIVE_CONF"; \
  sudo nginx -t && sudo systemctl reload nginx; exit 1; }

echo "Deploy complete. $IDLE_COLOR is now live; $LIVE_COLOR is idle and can be updated next time."

Everything from earlier modules shows up here on purpose:

  • module 1 — nginx upstream/reverse proxy is the switch mechanism.
  • module 3upstream blocks, same primitive as load balancing.
  • module 4 — one artifact promoted, never rebuilt per target.
  • module 5 — zero traffic ever hits a half-restarted process; the old color keeps serving until the new one is proven healthy.
  • module 6 — secrets for both colors come from per-color env files, not baked into the artifact.
  • module 7 — this whole script is what a CI/CD "deploy" job calls.
  • module 8/9 — the /health check and post-switch verification are the monitoring hooks that make step 6's automatic rollback possible.

Instant rollback

Because the previous color is still fully running (just idle, not destroyed) immediately after a switch, rollback is the same one-line sed + nginx reload used in step 6's automatic case — no redeploying old code, no waiting for a build:

sudo sed -i "/upstream active/,/}/ s/server 127.0.0.1:${NEW_PORT};/server 127.0.0.1:${OLD_PORT};/" /etc/nginx/sites-available/app.conf
sudo nginx -t && sudo systemctl reload nginx

Trade-offs to know

  • Blue-green needs 2x the running capacity of a single environment (both colors are fully provisioned, even though only one serves traffic at a time) — costlier than the rolling-restart pattern from module 5, but simpler to reason about and instantly reversible.
  • Database migrations must still follow the backward-compatible, multi-step pattern from module 5 — blue and green share one database, so a breaking schema change affects both colors regardless of which is "live."

How It Actually Works

Why the upstream active indirection, and not a direct upstream reference, is what makes the switch atomic. nginx resolves an upstream block's members at config-reload time, then holds open worker-process connections/keepalives against whatever it resolved. The deploy script never edits location / { proxy_pass ... } directly — it edits the upstream active block and reloads. nginx -s reload (which systemctl reload nginx sends) spawns new worker processes with the new config while old workers finish in-flight requests against the old upstream and then exit — so a request that started against blue completes against blue even mid-switch, and every new request after the reload gets green. There's no window where nginx is proxying to a config that doesn't parse or a color that isn't there, because nginx -t validates syntax before the switch ever executes.

Why health-checking the idle color before touching nginx matters more than it looks. The script hits 127.0.0.1:${IDLE_PORT} directly — bypassing nginx and the active upstream entirely — which is only possible because each color's systemd service binds its own port. This means the health check is a true readiness probe of the new process (post-fork/exec, past its own startup/migration/cache-warm logic) with zero chance of production traffic reaching it if the check fails, unlike a health check performed through the load balancer, which would need the LB to already be pointed at the new version to test it — a chicken-and-egg problem blue-green with per-color ports sidesteps entirely.

Why the "flip" step, not the deploy step, is the true point of no return. Right up until sed rewrites upstream active and nginx reloads, 100% of production traffic is still hitting the process that was running before the script started. Everything through step 4 (deploy, start, health-check, smoke-test) happens against a color receiving zero real traffic, so a bug found there costs nothing in production impact. That's the structural reason blue-green's rollback in step 6 is just the same sed pattern run in reverse: the "old" color was never stopped, its systemd unit is still active (running), and reversing the upstream line returns to exactly the prior request-serving state with no process restart, no artifact re-extraction, and no cold-start latency.

Exercise

  1. Set up two systemd services (myapp-blue, myapp-green) on different ports, an nginx config with the upstream active indirection above, and deploy a "v1" build to blue and switch active to it.
  2. Run the full script to deploy "v2" to green, watch it health-check, flip, and verify.
  3. Force a failure in the post-switch health check (e.g. crash the new process right after cutover) and confirm the script's automatic rollback correctly repoints active back to the previous color.